Fifteen Push Presses, Then an Eight-Minute Deadlift and Box Jump Ladder
UPLIFT IRON CLUBShare
Make the fifteen push presses a strength session, not a race

The day after Thanksgiving is an interesting time to test the difference between being powerful and simply being willing to suffer. This session opens with three sets of five barbell push presses at 75–80% of maximum, allowing two to three minutes between sets. It then switches to eight minutes of progressively longer sets of deadlifts and box jumps. The two blocks share a demand for rapid force production, but the way you manage fatigue should be entirely different in each.
Start by interpreting the percentage as a percentage of your current push press one-rep maximum, not your strict press or jerk. If you have never tested a push press maximum, do not turn the warm-up into an impromptu max-out. Select a weight at which five reps are challenging but smooth, with roughly two reps left in reserve. Someone whose current maximum is 100 kg would be looking at 75–80 kg; someone whose maximum is 60 kg would use 45–48 kg. Round down if the available plates or your readiness make the choice awkward.
The push press is not a strict press performed with a little cheating. It is a deliberate transfer of force from the floor through the legs, trunk and arms. Stand with the bar supported across the front of the shoulders, take a controlled shallow dip and drive upward before pressing the bar to a stable overhead position. Keep the torso tall during the dip. If you lean forward, the bar has to travel around you rather than straight above you. Unlike a push jerk, the push press ends without deliberately bending the knees again to receive the bar.
Use the full recovery interval if needed. The fifth rep should resemble the first far more closely than a desperate final rep in a bodybuilding drop set. If the bar starts drifting forward or you have to turn every rep into a jerk, reduce the weight. A good day is three repeatable sets with strong positions, not a new personal record followed by a compromised conditioning session.
For athletes who train overhead strength and conditioning.
Strength-and-endurance style for lifters, runners and hybrid athletes.
SHOP NOWUnderstand why a deadlift ladder grows faster than it looks

The eight-minute conditioning block pairs deadlifts with box jumps. Start with one of each, then two of each, then three of each, continuing the pattern until time expires. The listed barbell weights are 225 and 155 pounds (approximately 102 and 70 kg), with box heights of 30 and 24 inches (76 and 61 cm). These are ambitious reference loads and heights, not minimum requirements for a useful workout.
The deceptive part is the arithmetic. Completing round five means fifteen deadlifts and fifteen jumps, for thirty total repetitions. Complete round eight and the running totals rise to thirty-six of each, or seventy-two overall. Round ten takes you to fifty-five of each and 110 overall. Each new round adds more work than the last, so the first minute reveals surprisingly little about whether your pace is sustainable. Your score can climb quickly early on and then slow dramatically without any change in the weight on the bar.
Choose a deadlift load that you can lift confidently for at least ten to fifteen uninterrupted repetitions when fresh, even if you intend to use smaller sets during the workout. That is a useful practical screening test, not a requirement to perform an additional exhausting set before starting. For many athletes the appropriate load will be much lower than the prescribed numbers. Consider whether your grip, breathing and lower back can tolerate repeated sets after the push presses, not merely whether you can pull one successful rep.
Set up with the bar close to your shins, arms long and torso braced before the plates leave the floor. Extend your knees and hips together as you stand. At the top, finish upright instead of leaning backward. Lower the bar under control, allowing it to settle before the next repetition whenever you need to reset. A deadlift ladder is an exceptionally poor place to experiment with bouncing the plates or rushing a compromised starting position. Your goal is to complete many technically sound lifts under time pressure, not to discover how much your spine can tolerate when you are tired.
For lifters who love a heavy pull and a solid brace.
Keep the box jump an explosive movement rather than a survival trick

A box jump looks simple beside a heavy barbell, but its consequences change as the ladder develops. The first two rounds give you ample time to reset between jumps. Later, when you have just completed a long set of deadlifts, your legs may feel heavy and your attention may be split between the timer and the box. That is when the jump height becomes a meaningful programming decision.
Use a stable, non-slip box and select a height you can clear with room to spare. A successful jump should not require pulling your knees toward your chin and landing in a deep, unstable squat. Begin with both feet planted, use a natural arm swing and drive through the floor. Land with both feet securely on the surface, absorb the landing through the hips and knees, and stand tall before stepping down. Make sure the box cannot tip, slide or rock when you land. Keep it far enough from the barbell that a missed jump or a rolling plate cannot put you in the other's path.
Stepping down is a particularly sensible default for an eight-minute ladder. Rebounding immediately off the floor may save a second or two, but it increases the repeated elastic demand on the lower leg and Achilles tendon. That trade-off is unnecessary for someone who has not practiced and conditioned for it. A smooth step down also gives you a natural opportunity to restore your breathing before the next repetition.
Do not wait for your first missed jump to scale. If the takeoff starts feeling unpredictable, your landing becomes loud or uneven, or you are repeatedly catching the front edge, reduce the height or switch to controlled step-ups. The original movement is there to train explosive lower-body work under fatigue; the safer modification is there to keep you training when that exact movement is no longer appropriate. Neither the barbell weight nor the box height is a badge of honor. A well-scaled workout should still feel demanding without turning the last few minutes into a collision-avoidance exercise.
Celebrate leg day, even when the clock is running.
Budget the eight minutes before the clock starts

The optimal strategy is rarely to race the early rounds. In a ladder of one, two and three repetitions, the transitions account for a large proportion of your time. Establish an efficient station layout and a deliberate rhythm instead. Put the box where you can reach it safely in a few steps, keep the lifting area clear and decide where you will stand to chalk or catch your breath. You want a repeatable cycle that remains available once the sets get longer.
During minutes one and two, aim to feel almost too comfortable. Complete the short sets with clean mechanics and controlled transitions. During minutes three through six, reassess your deadlift sets: if five or six repetitions would leave you struggling to brace for the next lift, take a brief planned reset before that happens. You might split seven reps into four and three, or use fast but deliberate singles if you cannot keep the same setup through consecutive repetitions. The point of a break is to preserve the next repetition, not to take an indefinite holiday from the clock.
Keep the box jumps at a steady, sustainable cadence rather than trying to recover lost seconds through reckless landings. For example, an athlete who has completed round six has already performed twenty-one reps at each station. If that athlete spends another two minutes in round seven, the clock is still measuring productive work. There is no requirement to match the pace of the opening rounds. Progressively longer rounds are the actual design of the workout.
In the last minute, push the pace only if the movement quality is still present. You can shorten deliberate rest, but do not sacrifice the reset at the bottom of the deadlift or the position on the box. Record completed repetitions, not just the last round reached. Finishing round six and then adding three deadlifts gives you forty-five total reps; finishing round seven gives you fifty-six. Recording the total, weights and height gives you a useful baseline for a future attempt. A higher score is meaningful only if the comparison uses the same standards.
Warm up for both blocks and leave enough in the tank to recover

Because this session involves a shoulder-to-overhead lift, a loaded hinge and jumping, a few minutes on a cardio machine alone will not prepare every movement. Start with three to five minutes of easy cycling or rowing, then practice bodyweight squats, controlled hip hinges and low jumps. Use a light barbell for several strict presses, shallow dips and push presses, followed by a few progressive sets of the actual strength movement. If the overhead position feels restricted or painful, use a lighter load and a range of motion you can control, or choose a suitable alternative with a coach.
After the strength block, take a short transition to set up the conditioning stations. Perform a small number of deadlifts at the proposed working weight and a couple of jumps at the proposed height. This is your final decision point. If the load feels substantially heavier than expected or the box demands maximal effort, scale before starting. A sensible intermediate version might use a lighter barbell and a 20-inch box. A newer athlete could use two dumbbells for the deadlifts and a stable low box for step-ups. Keep the increasing rep pattern and eight-minute duration so the pacing lesson survives the modification.
There is also no need to treat a post-holiday session as a form of punishment for food eaten the previous day. Exercise is not a debt repayment system. A normal meal, water and an appropriate warm-up are more useful than attempting to erase yesterday's dinner by going to failure. If you slept poorly, are dehydrated or are unusually sore, lower the target intensity rather than forcing the prescribed load. If you have concerning symptoms, skip the intense workout and seek appropriate medical advice.
Once finished, walk for a few minutes, let your breathing settle and eat as you normally would after training. Write down how the last push press set felt, the deadlift load, jump height, total reps and whether you had to change your plan. These details tell you far more than the clock alone. The best outcome is a stronger, more confident athlete who can repeat the session on another day, not someone who needs a week to recover from eight minutes of ambition.

Functional-fitness shirts, tanks and workout gear for athletes who train strength, conditioning and everything in between.
EXPLORE COLLECTION
































